Flood Control Projects in Precinct 4 (2020–Present)
I believe residents deserve easy access to public information. These records were obtained through a Texas Public Information Act request and summarize flood control capital projects in Bexar County Precinct 4 from 2020 to the present.
Highlights from the records include:
- 5 flood control projects
- $57.6 million budgeted
- $21.3 million spent to date
- $36.3 million remaining
You can download the complete spreadsheet below.
